[1]
Valuev, A. 2007. A new model of resource planning for optimal project scheduling. Mathematical Modelling and Analysis. 12, 2 (Jun. 2007), 255-266. DOI:https://doi.org/10.3846/1392-6292.2007.12.255-266.